Are you looking for a residence or an investment in the Syokimau area?
This is a project you won’t be sorry to take a look at. Construction began in August 2021 and phase 1 was complete and ready for occupation in December 2022 – it’s SOLD OUT.
The second phase of the project began in mid-2022 and will be ready in September 2024. Bookings are ongoing at Kshs. 7.5m.
The entire development shall have 380 units across 5 acres of land. The estate is well-designed and blocks are spaced out to avoid congestion. There are play areas, gardens, and parking bays.
The developer has previously delivered 2 projects in the same area. All projects, including this, are characterized by functional design, quality finishes and fittings, space, and convenient amenities.
This 2 bedrooms unit is very sizeable at 105-sqm. It comes with an ensuite master bedroom while the other bedroom shares a common bathroom. The kitchen is spacious with ample storage cabinets. The lounge has a balcony, and the dining area is spacious.
Other highlights;
* Balcony at the lounge.
* Smart-lock doors.
* Modern elevators (in phase 2).
* A gym & swimming pool.
* A kids’ play area.
* Basketball & badminton courts.
* Borehole water.
* A shopping center.