These apartments are located in Kilimani off Menelik road.
Construction began in Q-1 of 2023 and the apartments should be ready for occupation in July 2024.
The community shall have a variety of supporting infrastructure and amenities;
* Fully equipped gym.
* A panoramic rooftop terrace.
* Sauna.
* Children play park.
* Swimming pool.
* Solar powered water heating systems.
* High pressure water supply.
* Back up generator.
* A lobby with 3 modern elevators.
* Cable internet and TV connectivity.
* CCTV and access control.
* Intercom communication.
* Ample parking.
√ Options are 82-sqm at Kshs. 8.7m and 88-sqm at Kshs. 9.3m.